MIB Viewer

aluDot1agCfmMepLmComplete

NOTIFICATION-TYPE
1.3.6.1.4.1.6527.6.1.2.3.6.0.1
Status
current
Sub-identifiers
0
The aluDot1agCfmMepLmComplete notification indicates the frame loss ratio result for the local MEP and the Far-end MEP after a single-ended test is completed. The test is considered successfully completed when the last expected Reply frame (LMR) was received and all of its test result info is calculated and saved in aluDot1agCfmMepLossRsltEntry within the 10 seconds since the start of the test. Otherwise, at the end of the 10 second timeout period, if the test cannot be completed successfully then the test is automatically terminated, and the notification is still sent.