MIB Viewer

h3cOnuLinkTestTable

OBJECT-TYPE
1.3.6.1.4.1.43.45.1.10.2.42.1.5.2
Access
not-accessible
Status
current
Sub-identifiers
1
LLID link test applying to the ONU only including delay measurement option. The command tests a link to a single LLID over a period of time or once, using a variable number of measurement frames. The length of the measurement frames is also parameterized. The test uses a loopback mode of the ONU to return each measurement frame, loopback activation is done using randomly patterned OAM Protocol Data Unit(PDU) frames.
SEQUENCE OF H3cOnuLinkTestEntry